See how Z2's customers keep their products running

Manufacturers rely on Z2 to map their supply chains, automate compliance, and act on disruption before it reaches the production line. These are their stories.

Every engineer’s parts request, now finished in half the time

Teradyne fielded up to 100 component requests a week on a slow, unreliable tool. Z2’s Part Risk Manager cut each one from ten minutes to five.

Read more

Scrambling for scarce chips, replaced by a resilient sourcing process

Through the chip shortage, Enphase hunted alternates by hand. Z2 turned that scramble into a standardized, score-driven workflow.

Read more

Quota-capped part lookups, traded for unlimited supply chain intelligence

Itron kept hitting its old vendor’s search limits with no concurrent access. Z2 gave the whole team deeper data, all at once.

Read more

A week of manual compliance checks, replaced by instant answers

Apollo once spent up to a week verifying compliance by spreadsheet and email. Z2 now clears its entire product portfolio in moments.

Read more

Earthquake-impact analysis that took days, now done in hours

When a 7.4 quake hit Taiwan, SICK needed days to find its exposure. With Z2 it now maps the same blast radius in a few hours.

Read more

Scattered tools for compliance and risk, consolidated into 10+ hours saved a week

QSC juggled separate tools for selection, compliance, and risk. Z2 brought them together and saves one engineer 10+ hours every week.

Read more

Thousands of mismatched part numbers, merged into one strategy

After years of acquisitions, Rakon struggled to consolidate IPNs and MPNs. Z2 unified component selection across its global business units.

Read more

Ad hoc component scrambles, replaced by a steady risk-buying cadence

Drone maker PDW faced constant component shortages with no formal process. Z2 became the backbone of its standard risk-analysis rituals.

Read more
A Global Healthcare Technology Leader

Sub-tier mapping that took weeks, now arrives in a day or two

A global medical device OEM waited weeks for sub-tier data to funnel up its supply chain. With Z2 the same picture lands in one to two days.

Read more

Spreadsheet part comparisons, replaced by side-by-side specs in one place

Airgain’s engineers built comparison charts in Excel and scoured the web for stock. Z2 put specs, availability, and compliance in a single view.

Read more