Engineering

Design out obsolescence before tape-out.

Z2 puts lifecycle status, EOL forecasts, and qualified alternates next to every part you spec. A component you design in today won't force a redesign before it ships.

Exploded technical illustration of a multilayer printed circuit board assembly
1B+ Off-the-shelf components tracked
10K+ PCNs monitored monthly
270+ Regulations covered
500+ Data sources monitored

The Challenge

Part selection decides the BOM's fate. Most of the data arrives too late.

Designing in risk

Z2 surfaces lifecycle status and EOL forecasts at the moment you spec the part — not after the BOM is locked.

Invisible obsolescence

Most EOL events happen with no formal PCN — Z2 catches lifecycle changes that manufacturers never announce.

PCN floods, no triage

Z2 deduplicates incoming PCNs, prioritizes by last-time-buy date, and routes each one before it's actioned too late.

Five products.
One component view.

Part Risk Manager

Every spec you need on one part,
not ten browser tabs.

Vetting a component means parametric specs, the datasheet, lifecycle status, RoHS and REACH compliance, availability, and pricing. Today that data is scattered across manufacturer sites, distributor catalogs, and compliance databases, and assembling it by hand burns hours per part. Z2's Part Risk Manager normalizes it into a single component record: parametric data, a six-factor risk score, lifecycle status, and an EOL forecast, side by side. One component engineer reports saving more than 10 hours a week.

See Part Risk Manager
NRND · End-of-life risk
OPA2387IDR
Texas Instruments · Dual Precision Op Amp
Six-Factor Risk Score
0
out of 100
EOL forecast 2.1 yr

Capabilities

Everything part selection demands. In one place.

Parametric Search

Search 1B+ off-the-shelf components across 1,000+ commodity types by the parameters that matter, with a normalized datasheet behind every result.

Lifecycle Forecasting

EOL forecasts at over 90% historical accuracy, built on the Sandborn/CALCE model from the University of Maryland, tell you how many years of life a part has before you design it in.

No-PCN EOL Detection

Z2 catches the tens of thousands of discontinuations that never get a formal notice, the ones that blindside teams watching only manufacturer PCNs.

PCN Triage

Populated out of the box from your uploaded MPNs against tens of millions of PCNs, deduplicated and sorted into eight priority levels by last-time-buy date.

Cross-Reference Search

A/B/C-tiered form/fit/function alternates with side-by-side spec comparison let you qualify a drop-in replacement instead of opening a redesign.

Compliance Status

RoHS, REACH, PFAS, TSCA, and conflict minerals tracked across the full BOM as a selection gate, with out-of-box coverage for 80% of parts.

Drop-in alternate found
OPA4180IDR A
Form/fit/function match for discontinued AD8513ARZ
Spec
AD8513ARZ
OPA4180
Supply
36V
36V
GBW
8 MHz
8 MHz
Lifecycle
EOL
Active

Cross-Reference Search

A part goes EOL.
Find the drop-in before redesign.

When a component goes NRND or EOL, the fastest fix is a form/fit/function alternate, not a redesign that can cost hundreds of thousands in engineering and NPI time. Z2 ranks cross-references into A/B/C tiers, where an A match is the closest form/fit/function fit and a C flags parts that need engineering review. Line up as many alternates as you want and compare specs row by row to see exactly where they match and where they diverge.

See Part Risk Manager

Use Cases

Built for everyone who touches
the BOM.

Design Engineering

Check availability before you commit to a part

Confirm a candidate component is in production and well clear of EOL during NPI, not after the schematic is frozen. Lifecycle status and risk score sit right next to the parametric specs.

Component Engineering

One record, from selection to qualification

Pull parametric data, datasheets, lifecycle status, and compliance for any MPN without hunting across a dozen sites. The same record carries you from part selection through qualification and reliability review.

Obsolescence Management

See the last-time-buy window while you still have one

Track NRND and EOL across the BOM with LTB dates ranked by priority. Place the bridge buy inside the window instead of paying 10-100x on the secondary market after it closes.

Engineering Management

One risk number per BOM, not a spreadsheet

Roll obsolescence and risk scores up to the BOM level for a live view of design-for-availability health. Catch the parts that turn into redesigns before they reach a production program.

Why It Matters

The redesign you avoid
is the cheapest one.

The cost of a part decision compounds the later you catch it. A bridge buy placed after the last-time-buy window closes can run 10 to 100 times normal price on the secondary market, and an unexpected EOL that forces a redesign costs hundreds of thousands in engineering and NPI time. Z2 moves that decision back to design time, where changing a part is free.

10-100x what a bridge buy can cost on the secondary market after the LTB window closes
Tens of thousands lifecycle changes Z2 detected with no PCN ever issued
90%+ historical accuracy of Z2's EOL lifecycle forecasts
Airgain

If I'm designing something new, I'll use Z2 to look and see if the part that I am planning on using is readily available.

Spec your next BOM
with the data, not against it.