Webinar - Beyond EOL: Part Risks That Surface After Your Design Ships
How often do BOM risks show up after your design is already locked?
Your BOM was locked months ago—but risk doesn't stop at release. EOL notices get attention, but tariff shifts, country-of-origin changes, packaging updates, and supplier instability can all impact parts already in production—often too late, when redesigns are costly and options limited.
Join Z2 to learn about the types of part-level risks that often emerge after design—and how to account for them earlier, when you still have leverage.
You'll learn:
- The hidden risks that impact components after design lock
- Why these risks are often missed during design
- How to factor them in earlier to avoid costly redesigns
- Where to access reliable part-level risk data
- Real examples of teams avoiding costly redesigns
📅 May 27, 2026 | 10am PT (1:00pm ET)
Your BOM was locked months ago—but risk doesn't stop at release. EOL notices get attention, but tariff shifts, country-of-origin changes, packaging updates, and supplier instability can all impact parts already in production—often too late, when redesigns are costly and options limited.
Join Z2 to learn about the types of part-level risks that often emerge after design—and how to account for them earlier, when you still have leverage.
You'll learn:
- The hidden risks that impact components after design lock
- Why these risks are often missed during design
- How to factor them in earlier to avoid costly redesigns
- Where to access reliable part-level risk data
- Real examples of teams avoiding costly redesigns
📅 May 27, 2026 | 10am PT (1:00pm ET)

.png)