9/10 NPS Score 9/10 customers would recommend Z2 to a peer. Source: Z2 Customer Satisfaction Survey

Get ahead of obsolescence.

Z2 tracks every part's lifecycle, forecasts end-of-life before the last-time-buy window closes, and surfaces validated drop-in replacements in one pass.

  • 90%+ accurate lifecycle forecasts
  • Find form-fit-function alternates
  • IEC 62402 and SD-22 process ready

Obsolescence teams at leading OEMs run on Z2

The level of insight that it was able to give us was far superior to what we had seen before with our incumbent solution.

Manual obsolescence tracking doesn’t scale.

82K+ components reach end-of-life every year with no PCN ever issued. Tracking that by inbox and spreadsheet means you learn after the part is already gone.

Task Without Z2 With Z2
EOL detection Learn after the part hits stockout Forecast EOL before the last-time-buy date
PCN handling Hundreds of duplicate notices per month Deduplicated, normalized, flagged by priority
Finding alternates Weeks hunting datasheets for a cross A/B/C drop-in alternates pre-mapped per part

The full lifecycle picture, per part.

Every component on your BOM carries the same lifecycle fields, pulled from the Z2 database and kept current.

Lifecycle stage
Every part is tagged Active, NRND, EOL, or Obsolete across six stages from NPI to end of life, so you always know where each component stands.
Years-to-EOL forecast
A projected years-to-EOL estimate backed by 90%+ historical accuracy, giving you a head start on at-risk parts long before the manufacturer announces it.
Last-Time-Buy date
The last-time-buy deadline for every at-risk part, so you can prioritize bridge buys and place orders before the purchase window closes for good.
Product Change Notification history
Product and discontinuance change notices deduplicated and normalized per part, turning scattered vendor PDFs into one clean, searchable change history.
Cross-reference alternates
A, B, and C tier drop-in alternates with a side-by-side parametric diff, so you can qualify a replacement in minutes instead of weeks.
Obsolescence risk score
A composite score that rolls up lifecycle, EOL forecast, and supplier health into a single number you can sort, filter, and act on.

Why teams retire the spreadsheet.

Capability All-in-one Spreadsheets & email Basic part-search
Real-time lifecycle status per part Yes No Partial
EOL forecast at 90%+ accuracy Yes No No
Screen an entire BOM at once Yes No No
EOL events captured with no PCN Yes No No
Deduplicated, normalized PCN history Yes No Partial
Pre-mapped A/B/C drop-in alternates Yes No Partial
Last-time-buy and lifecycle alerts Yes No No
Composite obsolescence risk score Yes No No
Export to any PLM or ERP system Yes No Partial

See your BOM’s obsolescence exposure.

Lifecycle forecasting

Know the EOL date before the notice arrives.

Z2 projects years-to-EOL from market demand, part activity, the total count of active manufacturing sites, and technology roadmaps. The forecast holds at over 90% historical accuracy, built in-house by Z2 and validated against actual end-of-life outcomes. That gives you room to plan a bridge buy or a redesign while the part is still orderable, instead of reacting after the last-time-buy window has closed.

No-PCN coverage

Catch the discontinuations no one announces.

A large fraction of components reach end-of-life with no PCN ever issued, so any process built only on manufacturer notices is blind to them. Z2 tracked 82K+ lifecycle changes in a single year that occurred without any PCN, alongside a database of tens of millions of formal notices, all deduplicated and normalized. One real change no longer arrives as three or four conflicting emails sitting unread in an inbox.

Alternate sourcing

A qualified cross, ready when the part goes.

Every part carries pre-mapped alternates ranked in A/B/C tiers, from the closest form-fit-function match down to crosses that need engineering review. Filter by country of origin, lifecycle stage, compliance status, and availability, then compare candidates side by side in a single diff. The weeks normally spent hunting datasheets collapse into a shortlist you can act on before a late bridge buy costs 10 to 100 times more on the secondary market.

Part Risk Manager

Part Risk Manager

Everything on this page is one tool: Part Risk Manager. It tracks lifecycle, forecasts EOL, deduplicates PCNs, scores obsolescence risk, and maps alternates across your entire BOM in a single workspace.

Get Started Free
Obsolescence management tracking end-of-life parts across the electronics supply chain

From BOM to a mitigation plan.

Questions obsolescence teams ask first.

How accurate is the EOL forecast?

The years-to-EOL forecast holds at over 90% historical accuracy. It uses a proprietary Z2 algorithm, refined continuously and validated against real outcomes using market demand, part activity, and active manufacturing-site data.

Can Z2 catch discontinuations that ship with no PCN?

Yes. A large share of end-of-life events are never announced through a PCN. In a single year Z2 captured 82K+ lifecycle changes that occurred with no notice, so your team sees them even when the manufacturer stays silent.

How does Z2 handle PCN overload?

Engineers at large OEMs receive hundreds of PCNs a month, and one change often arrives as three or four duplicates. Z2 deduplicates and normalizes every notice against a database of tens of millions of PCNs, then flags what needs action by priority.

How do I find a replacement when a part goes obsolete?

Alternates are pre-mapped. Every part carries A/B/C cross-reference tiers, from closest form-fit-function match to crosses needing engineering review, filterable by country of origin, lifecycle, compliance, and availability.

Obsolescence is just the beginning.

The same part-level data powers risk, compliance, and sourcing across your whole BOM.

Lifecycle status EOL forecast PCN/PDN feeds Cross-reference alternates Last-time-buy Obsolescence risk score NRND detection BOM risk analysis Market availability
Distributor pricing Parametric data Country of origin HTS codes Supplier profiles Manufacturer profiles Counterfeit risk Form-fit-function match Bridge-buy planning
REACH status RoHS status PFAS status Conflict minerals Sub-tier mapping Supplier financial health Sanctions screening Site mapping Redesign avoidance
1B+

components tracked

200K+

manufacturing sites mapped

270+

regulations covered

Support that shows up

Real supply chain expertise, not just a support ticket queue.

9/10 Customers would recommend Z2 to a peer
<4h Average first response time for enterprise accounts

Oliver DeThier

Director of Customer Success

Trusted by leading
OEMs worldwide.

Part Risk Manager

Make obsolescence the risk you saw coming.